Livestock Feeder Fabrication Plan
A plan for building steel livestock feeders sized to the herd, with safety and cleaning in mind.
Why keep this record
A feeder that works for cattle can injure sheep, and a feeder that is perfect for calves wastes hay with adults. Good feeder design starts with the animals: their number, size, and how they behave at the bunk. It then considers hay or grain waste, drainage, cleaning and the way the feeder will be filled. Use this plan before cutting steel, so that the dimensions come from the herd rather than from a convenient stock length.
Worksheet
| Plan item | Decision | Notes |
|---|---|---|
| Species and age group | ||
| Number of animals per feeder | ||
| Feed type (hay, grain, silage) | ||
| Feeding space per head | ||
| Feeder height and depth | ||
| Bar or panel spacing | ||
| Drainage and cleaning access | ||
| Frame material and thickness | ||
| Filling method (loader, hand, bale) | ||
| Coating and ground contact |
How to complete it
- Write down the species, age and number of animals that will use the feeder at once.
- Choose the feeding space per head, using extension recommendations for your species and age.
- Decide whether the feeder is filled by hand, by loader or from a truck, and leave clearance for that.
- Sketch the frame with dimensions and check that rails and bars cannot trap heads or legs.
- Add drain holes or slots in any bottom that can hold water and ice.
- Plan coating and ground contact so rust does not shorten the feeder's life.
A sample entry
Feeder for twenty yearling heifers. Space per head set at 20 inches. Bunk length 33 feet, divided in two pieces. Height 30 inches, depth 24 inches with a drain slot every four feet. Frame of 2 inch tube, sheet bottom, rounded top rail. Primer and enamel.
Reading the results
After a month of use, watch the animals at the feeder. Bullying at one end, feed waste or hay pulled to the ground tells you the layout needs adjusting. A small modification such as a divider or lower rail can improve use more than a new feeder.
Shop tip
Build the first feeder as a prototype and watch the herd with it before building the rest. Animals find weaknesses you never considered, and a week of observation costs nothing compared with building six identical feeders that all share the same flaw.
Common mistakes
- Making the gaps in the bars fit a head.
- Ignoring drainage so water and ice collect.
- Building one big feeder when two would reduce bullying.
Stop and get help if
- The design leaves gaps that fit an animal's head or leg.
- The feeder could tip under the animals pushing on it.
- Your plan has sharp internal corners where feed packs.
Keeping the record
Ask your extension office or veterinarian for current space-per-head guidance, since recommendations vary by species and class. Keep the finished drawing for copies and repairs.