Welding & Fabrication

Custom Fabrication Quote Worksheet

A worksheet for building a written quote on custom metalwork so material, labor and risk are all priced.

Why keep this record

Underpriced quotes are the quiet killer of fabrication shops. A job that looks like six hours often takes ten, once layout, fit-up, grinding, coating and clean-up are counted. A good quote worksheet forces you to price every stage and to state what the customer is and is not getting. Write the quote before you start cutting, not after the customer has already seen the project taking shape in your shop.

Worksheet

Quote itemQuantityUnit costLine total
Steel and stock
Consumables (wire, rod, gas)
Cutting discs and abrasives
Hardware and fasteners
Layout and cutting labor
Fit-up and welding labor
Grinding and finishing labor
Paint or coating
Delivery or hauling
Contingency for unknowns

How to complete it

  1. Start with a drawing and written dimensions agreed with the customer.
  2. Price the metal from a current supplier quote, adding cutting waste of at least ten percent.
  3. Estimate labor by stage and multiply by your shop rate, not your wage.
  4. Add consumables and tool wear as separate lines so they are not forgotten.
  5. Include a contingency for unknowns such as rusted bolts or bent parts, and say so on the quote.
  6. State the quote's expiry date, the deposit required and what is excluded.

A sample entry

Hay trailer repair: steel $220 for 28 feet of angle and plate, consumables $35, discs $15, labor eight hours at $65 for $520, paint $30, contingency $70. Total $890 with a $300 deposit and a 30 day quote life. Excluded: replacement of the rotted floor boards.

Reading the results

After the job, write the actual hours and costs beside the quote lines. If labor was twenty percent over on three jobs in a row, your shop rate or hour estimates are wrong. Fix the worksheet, not the customer.

Shop tip

Quote in ranges when the repair is a guess, such as between $400 and $650 depending on what is found under the rust, and write what would move the price. Customers accept uncertainty far better than a surprise bill. Always confirm what they plan to do with the finished piece.

Common mistakes

  • Quoting without a drawing or written scope.
  • Leaving out grinding, painting and cleanup time.
  • Letting the quote stand with no expiry date.

Stop and get help if

  • The customer wants the quote to cover work you cannot inspect.
  • The part will carry people, trailers or livestock and the design is not yours.
  • You are being pressured to cut the price below your costs.

Keeping the record

Keep every quote, even those that were never accepted. Six months later they are the best record of what you thought a job would cost, and compared with the actual job record they show whether your estimates are drifting.