Fabrication Material Takeoff
A takeoff sheet for counting every piece of steel in a project before ordering metal.
Why keep this record
A material takeoff is the list of everything you need to buy, with sizes and lengths, before you place an order. It prevents the two most common ordering mistakes: running short on a Friday afternoon and buying twice what the project needs. A good takeoff comes from the drawing, not from memory. Count each piece, add length for saw kerf and mistakes, and then combine pieces so that stock lengths of twenty feet are used efficiently.
Worksheet
| Piece and description | Size and shape | Cut length | Quantity | Stock length needed | Waste |
|---|---|---|---|---|---|
| Main frame rails | |||||
| Cross members | |||||
| Legs or posts | |||||
| Gussets | |||||
| Base plates | |||||
| Braces | |||||
| Hinges or tabs | |||||
| Handles or hooks | |||||
| Fasteners | |||||
| Total stock to order |
How to complete it
- Work from a dimensioned drawing and list each distinct piece once, with the quantity needed.
- Write the profile, such as square tube, angle, flat bar or pipe, and its thickness.
- Add an allowance for saw cuts and for squaring the ends. A quarter inch per cut is a reasonable start.
- Group pieces of the same profile and plan how they fit on twenty foot lengths to reduce waste.
- Add ten percent as a reserve for errors or defects on longer projects.
- Check the order against the drawing one more time before you call the supplier.
A sample entry
Frame for a utility trailer: 2 by 2 by 3/16 inch tube. Two rails at 96 inches, four cross pieces at 48 inches. Total 384 inches plus 6 cuts at a quarter inch, about 386 inches, which is one 24 foot length with a small remainder. Ordered one 24 foot piece plus a spare 20 foot.
Reading the results
If the leftover on every job runs above fifteen percent, rethink how you cut. Cutting longer pieces first, then fitting shorter pieces from the remainder, usually saves a stick of steel per project. Keep your off-cuts in a labeled rack.
Shop tip
Mark each piece on the drawing with a number that matches the takeoff, and write the same number on the metal with a paint marker after cutting. When twenty similar pieces are laid on the floor, the numbers stop mix-ups. It also makes it easy to see what is left if the project gets interrupted.
Common mistakes
- Forgetting saw kerf and then coming up an inch short.
- Ordering twenty foot sticks for pieces that need twenty-one feet.
- Not checking the final list against the drawing.
Stop and get help if
- The drawing is incomplete or still being changed.
- The supplier substitutes a different grade or thickness without telling you.
- The project's loads have not been checked.
Keeping the record
Keep the takeoff with the job file. Compare it afterward with what you actually used, and the difference will teach you how much waste your style of building really creates.